| 1. | Grouting test of 6 tunnel in the south main line of yellow river division project 引黄工程南干线6号隧洞灌浆试验 |
| 2. | Inspection of xiluodu hydroelectric power station dam foundation consolidation grouting test 溪洛渡水电站坝基固结灌浆试验检测 |
| 3. | Curtain grouting test for replacing seepage prevention wall of stage i soil - rock cofferdam of tgp 三峡工程一期土石围堰以幕代墙灌浆试验 |
| 4. | Application of high - pressure jet grouting test in consolidation works of quting reservoir 高压喷射灌浆试验在曲亭水库除险加固工程中的应用 |
| 5. | For checking the availability and rational of the computing program , the grouting test in - situ of the xiluodu hydroelectric project were simulated and computed , and also simulated the next conditions which the result of the grouting test will be used in 为检验所编程序的合理性和适用性,对溪洛渡工程的现场固结灌浆试验进行了模拟计算,并对灌浆试验成果将来运用情况进行了补充模拟计算。 |
| 6. | 5 . there are 979 . 32 meter long to the curtain of the xiangshuiriver reservoir include 879 . 32 meter " s long double row curtain ( about 92 percent ) in the original design . by optimizing the design according to the grouting test , the double row curtain was cut down to 245 . 66 meter length ( 25 per cent of them ) , the density of the bore hole have from 0 . 81m / m2 reduced to 0 . 64m / m2 . total save 4 . 47 million rmb cost of the project 5 、在总长为979 . 32m长的帷幕段中,初设批复方案的双排帷幕总长为879 . 32m ,占帷幕总长的92 % ,根据灌浆试验研究成果优化设计后,双排帷幕长度减少至245 . “ m ,仅占帷幕总长度的25 % 。 |
| 7. | ( 4 ) one row seepage wall , which is formed by sprinkling grouting method , is used to the xiacouba reservoir project for cutting off the way of seepage on the basis of the project condition and grouting test . the results testified that a sound effectiveness of preventing seepage could be attained by the application of the high - pressure sprinkling grouting technology if design paramenter is proper and the construction quality is controlled strictly 根据工程要求、 _仁质条件及灌浆试验,本工程选用单排旋喷套接的方式形成防渗墙,实践证明,只要设计参数合理,施工过程严格控制,利用高压喷射灌浆技术可达到防渗、堵漏的目的。 |
| 8. | The grouting test result shows that this technique of pile foundation construction is effective , it can not only increase the upper and skin friction of the cast - in - place pile , but also improve the bearing capacity of the cast - in - place pile , and gain a larger economic benefit for whole project at the same time 经桩端压浆实验结果表明,该技术可以增加钻孔灌注桩桩端阻力和桩侧壁摩阻力,是一项行之有效的桩基施工技术,它可有效提高钻孔灌注桩的承载能力,同时提高经济效益。 |
| 9. | In this paper the computing program which can simulate the grouting test on the computer has been setup by using she theory of the simulation and computation . and more real available information to the grouting construction can be supplied by using the result of this simulation and the result of the grouting test 本论文试图运用工程模拟仿真理论编制计算程序,在计算机上实现对灌浆过程、灌浆成果的模拟,并结合灌浆试验的成果,对灌浆施工提供尽可能多的、有效的信息。 |
| 10. | The grouting is the most useful method of the ground treatment , specially to deal with the rock foundation of the dam . because of the concealment , complexity and importance of the grouting project . the grouting test must be done to determine the grouting parameter , such as the grouting technology , the grouting material , etc 灌浆是基础处理的常用方法,尤其是建立在岩石基础上的大坝的基础处理,由于灌浆工程的隐蔽性、复杂性和重要性,通常需要进行灌浆试验来确定灌浆工艺、浆材等灌浆参数,而灌浆试验由于其复杂性、试验数量的限制等因素难以为灌浆施工提供全面有效、真实的灌浆信息。 |